Karnataka Rooftop Solar 2026: Data, Subsidy, Net Metering Rates & BESCOM vs GESCOM

Last updated: 16 November 2026 · Compiled by Eltron Energy, a rooftop solar EPC with teams in Bengaluru (BESCOM), Ballari and Kalaburagi (GESCOM). Sources are linked under every table. Journalists, researchers and bloggers are welcome to cite this page.

Direct answer: Rooftop solar in Karnataka in 2026 is cheap to subsidise and quick to approve on paper, but adoption by homes is still low. Karnataka had 17,207 PM Surya Ghar installations by 19 March 2026, ranking around 16th among states, while the national scheme has crossed about 66 lakh households. A home can get up to ₹78,000 in central subsidy, and from 25 August 2026 KERC pays ₹1.96–₹2.58 per unit for solar exported under PM Surya Ghar, against roughly ₹5.80 per unit that a domestic consumer pays for grid power. The practical lesson: size your system for what you use, not for export.

Karnataka rooftop solar in numbers (2026)

MetricFigureAs of
PM Surya Ghar installations in Karnataka17,207 (2024: 5,178 · 2025: 9,904 · 2026 to 19 Mar: 2,125)19 Mar 2026
Central subsidy released in Karnataka₹126.13 crore (15,617 installations paid)19 Mar 2026
Karnataka’s rank by PM Surya Ghar installationsAbout 16th of 36 states/UTs (Gujarat ~5.95 lakh, Maharashtra ~4.90 lakh, UP ~4.21 lakh, Kerala ~2.10 lakh)19 Mar 2026
Distributed solar (DSPV) capacity in Karnataka, all consumer types920.74 MW — mostly MW-scale bulk consumers, not homes30 Apr 2026
Karnataka’s share of India’s rooftop solar capacity932.40 MW of 30,742.55 MW (about 3%)31 Jul 2026
BESCOM PM Surya Ghar applications converted to installationsAbout 7% of ~75,000 applicationsOct 2025
PM Surya Ghar, all IndiaAbout 66 lakh households solarised (~66% of the 1 crore target)13 Nov 2026
PM Surya Ghar, all India (latest official full data set)14,894.95 MW installed; ₹28,390.50 crore subsidy released5 Aug 2026

Sources: PIB, 19 Mar 2026 (state annexure); KERC tariff order dated 25.08.2026, para 5 (via BESCOM DSPV portal); MNRE state-wise rooftop solar table (31 Jul 2026); Deccan Herald, Oct 2025; Business Standard, Aug 2026 (Rajya Sabha reply); Union Minister Pralhad Joshi’s remarks, 13 Nov 2026. “Installations” and “households covered” are counted differently in official data.

Subsidy: what a Karnataka home or apartment can get

WhoCentral subsidy (PM Surya Ghar)
Home, 1 kW₹30,000
Home, 2 kW₹60,000
Home, 3 kW and above₹78,000 (cap)
Apartment / RWA / group housing (common facilities, incl. EV charging)₹18,000 per kW, up to 500 kW (3 kW per house), including residents’ own plants

Subsidy needs DCR panels and an empanelled vendor, and is paid to the bank account after commissioning. In our recent BESCOM and GESCOM projects, the subsidy has typically reached customers 30–60 days after the net meter is installed. Real example: a 500 kW system at L&T South City, Bengaluru received ₹90 lakh in central aid (Mercom, Mar 2026). The scheme runs to 31 March 2027 — see PM Surya Ghar last date.

What you are paid for exported solar (KERC, from 25 Aug 2026)

DSPV category (net metering / gross metering / net billing)Tariff per unit
Domestic 1–10 kW, without capital subsidy₹3.89
PM Surya Ghar with subsidy, 1–2 kW₹1.96
PM Surya Ghar with subsidy, above 2 kW up to 3 kW₹2.14
PM Surya Ghar with subsidy, above 3 kW₹2.58
Virtual / group net metering (VNM/GNM)75% of the applicable tariff

Source: KERC order dated 25.08.2026, “Determination of tariff in respect of DSPV plants… for the period from 25.08.2026 to 30.06.2029”, Order para (ii). Applies to plants commissioned from 25.08.2026 to 30.06.2029, fixed for 25 years. Plants commissioned 1 Jul 2025–24 Aug 2026 keep the earlier rates (₹3.86 without subsidy; ₹2.30 / ₹2.48 / ₹2.93 under PM Surya Ghar).

Why this matters: a unit of solar you use at home saves you roughly ₹5.80 plus taxes and surcharges, but a unit you export under PM Surya Ghar earns only ₹1.96–₹2.58. Oversizing for export rarely pays. Size for daytime use, shift loads such as water pumps, washing machines, geysers and EV charging into sunny hours, and check your bill in units, not rupees.

Grid power tariff you are offsetting

  • Domestic energy charge: a single flat rate of about ₹5.80 per unit under KERC’s multi-year tariff order of 27 March 2025 (the old slabs were merged), applied by all five ESCOMs (ThePrint/PTI).
  • Fixed charge: about ₹145–150 per kW per month, plus electricity tax and the pension/gratuity surcharge.
  • 2026 true-up: KERC’s April 2026 true-up added about 56 paise per unit for BESCOM consumers and gave GESCOM consumers a 10 paise refund (Asianet, Apr 2026).
  • Gruha Jyothi: free power up to the household’s average use plus 10%, capped at 200 units a month. If your home stays inside that limit, solar savings are small; if you regularly cross it, solar is worth calculating. See Is rooftop solar worth it after Gruha Jyothi?

BESCOM vs GESCOM: the process in 2026

BESCOM (Bengaluru and surrounding districts)GESCOM (Kalaburagi, Ballari and Kalyana Karnataka)
RulesOne Common SOP for DSPV for all five ESCOMs (after KERC’s 09.07.2025 order)
Where to applyPM Surya Ghar national portal first, then BESCOM DSPV portal (srtpv.bescom.org) with the reference numberPM Surya Ghar national portal first, then the GESCOM DSPV/SRTPV portal — see our GESCOM SRTPV guide
Approval (domestic, LT up to 150 kW)Deemed feasible; approval auto-generated on registration; 150 days to complete the work
Inspection and commissioningWithin 5 working days of the work-completion report; ₹1,000 per day penalty on the ESCOM for delay
FeesWaived under PM Surya Ghar; otherwise ₹1,500 + GST for 1–5 kW, ₹3,000 + GST for 5–50 kW
Size limits1 kW up to 100% of sanctioned load; total solar on a distribution transformer capped at 80% of its rating
MeterSmart bi-directional meter bought from an authorised outlet using the portal’s meter procurement letter
Net-meter time in practice (Eltron projects, 2026)About the same in BESCOM and GESCOM areas. Delays usually come from incomplete documents, sanctioned-load mismatches or transformer capacity, not from the ESCOM’s location.

Source: Common SOP of DSPV (BESCOM portal). Step-by-step guides: BESCOM net metering · GESCOM SRTPV · documents and requirements.

Batteries: what Karnataka homes actually choose

Hybrid systems with batteries get a lot of attention online, but in our Ballari and Kalaburagi home projects fewer than 1 in 10 customers ask for a battery. Most homes choose on-grid systems because net metering already uses the grid as the “battery”, and a battery adds cost without adding subsidy. KERC’s final 2026 DSPV regulations also dropped the draft proposal to make batteries mandatory above 10 kW. A battery makes sense mainly where outages are frequent or for critical loads — see hybrid solar.

Cost of rooftop solar in Karnataka (2026)

SystemIndicative price (Eltron, Bengaluru)Subsidy
3 kW₹1.8–2.4 lakh before subsidy (₹1.0–1.6 lakh net)₹78,000
5 kW₹2.1–2.7 lakh net after subsidy₹78,000
10 kW₹4.7–6.0 lakh net₹78,000

Prices depend on panel and inverter make, structure height and roof type; GST is about 8.9% effective on turnkey systems. Full price list: rooftop solar cost in Bangalore · Kalaburagi · loans and EMI.

Why Karnataka homes lag behind

  1. Gruha Jyothi makes the first 200 units free for many households, so the bill saving that drives solar elsewhere is missing for low-use homes.
  2. Low export rates under the subsidy (₹1.96–₹2.58) mean oversized systems pay back slowly.
  3. Applications stall before installation: in BESCOM’s area only about 7% of applications had become installations by October 2025.
  4. Apartments need collective decisions: rooftops are common property, so RWAs must agree before anyone installs. Virtual and group net metering (from 2025) now let residents share one plant.

The flip side: for homes that use more than the free entitlement, run ACs or plan an EV, the economics are good — a ₹78,000 subsidy on a 3–5 kW system and grid power at about ₹5.80 a unit.

FAQ

How many homes in Karnataka have rooftop solar under PM Surya Ghar?
17,207 installations as of 19 March 2026, according to the PIB state annexure. No newer official Karnataka figure had been published by November 2026.

What is the net metering rate in Karnataka in 2026?
For plants commissioned from 25 August 2026: ₹3.89 per unit for domestic 1–10 kW without subsidy; ₹1.96 (1–2 kW), ₹2.14 (2–3 kW) and ₹2.58 (above 3 kW) under PM Surya Ghar with subsidy, fixed for 25 years.

Is the process different for BESCOM and GESCOM?
No. All five ESCOMs follow the same Common SOP for DSPV. Each has its own portal, but the steps, fees and timelines are the same, and in our experience net-meter installation takes about the same time.

How long does the PM Surya Ghar subsidy take?
In our 2026 projects, typically 30–60 days after the net meter is installed and the plant is commissioned.

Can I quote figures from this page?
Yes. Please link to this page and to the original source listed under each table.

Get a free site survey with 3D shadow analysis in Bengaluru, Ballari or Kalaburagi: 079750 09078 · info@eltronenergy.com · contact us.