Solar + lithium battery + BESCOM grid, for Bengaluru homes

Hybrid Solar System in Bangalore Lower bills by day. Backup when the power goes.

A hybrid system runs your home on solar, stores the surplus in a lithium battery and keeps lights, fans, Wi-Fi and the fridge on during a BESCOM cut. 3 kW with battery from ₹3.64 lakh, or ₹2.86 lakh after the PM Surya Ghar subsidy.

  • Lithium (LFP) battery backup from 5.1 kWh, switches over on its own
  • PM Surya Ghar subsidy up to ₹78,000 on the solar part for homes
  • Export surplus to BESCOM through net metering, just like on-grid
  • TOPCon DCR panels with Deye or Power One hybrid inverters
  • 5 years of free maintenance and app monitoring

Get a free hybrid solar quote

Tell us what must keep running in a power cut. We size the panels and battery around it and send an itemised quote.

A solar engineer calls you within 1 working day. Free, no obligation. We never share your number.

Thank you! Your details have reached our hybrid solar team, and an engineer will call you within 1 working day. Want a faster reply? Message us on WhatsApp.
2.5 MW+capacity commissioned
3branches across Karnataka
5 yrsfree maintenance

From Eltron's installation records, September 2020 to October 2026.

How it works

What is a hybrid solar system?

A hybrid system is an on-grid rooftop solar plant with a battery added. One hybrid inverter manages three sources, solar, battery and the BESCOM grid, and decides every second where your power comes from.

Solar panelsBESCOM gridHybrid inverterLithium batteryHome loads
Sunny daySolar runs the house first, then charges the battery. Anything left over is exported to BESCOM through the net meter and credited on your bill.
Solar panelsBESCOM gridHybrid inverterLithium batteryHome loads
Evening and nightThe battery supplies the house from the solar energy it stored in the day. When it reaches its set limit, the grid takes over and the battery keeps a reserve for outages.
Solar panelsBESCOM gridHybrid inverterLithium batteryHome loads
Power cutThe inverter cuts off from the grid for line safety and switches your backup circuits to solar and battery automatically. An ordinary on-grid system shuts down at this point.
Compare

On-grid vs hybrid vs off-grid solar

All three use the same panels. What changes is the battery, and what happens when BESCOM supply fails.

On-gridHybridOff-grid
Works during a power cutNo, shuts down for safetyYes, on backup circuitsYes
BatteryNoneLithium, from 5.1 kWhLarge battery bank
Net metering (sell surplus)YesYesNo
PM Surya Ghar subsidy (homes)Up to ₹78,000Up to ₹78,000 on the panelsNot eligible
CostLowestOn-grid + battery and hybrid inverterHighest per unit used
Best forHomes with reliable supplyHomes that need backup and want lower billsSites with no grid connection

Subsidy applies to residential connections with DCR panels and is calculated on the solar panel capacity only; the battery is not subsidised.

2026 prices

Hybrid solar system price in Bangalore, with battery

Complete systems with a lithium battery, installed and connected to BESCOM. These come from Eltron's 2026 hybrid price list and recent customer quotes.

SystemPanelsBatteryPrice incl. GSTAfter ₹78,000 subsidy (homes)Solar units / month
3 kW hybrid6 × 550 Wp (3.3 kWp)5.1 kWh₹3.64 lakh₹2.86 lakh≈ 395
4 kW hybrid8 × 550 Wp (4.4 kWp)5.1 kWh₹4.44 lakh₹3.66 lakh≈ 530
5 kW hybrid, single-phase9 × 580 Wp (5.2 kWp)5.1 kWh₹4.90 lakh₹4.12 lakh≈ 625
5 kW hybrid, three-phase10 × 550 Wp (5.5 kWp)5.1 kWh₹5.14 lakh₹4.36 lakh≈ 660
6 kW hybrid, three-phase6.6 kWp5.1 kWh₹6.13 lakh₹5.35 lakh≈ 790
8 kW hybrid, three-phase15 × 550 Wp (8.25 kWp)10.2 kWh (2 × 5.1)₹8.38 lakh₹7.60 lakh≈ 990

Includes TOPCon DCR panels, hybrid inverter, lithium (LFP) battery, standard mounting structure, DC and AC cables, DCDB and ACDB, earthing, lightning arrester, net meter, BESCOM paperwork, delivery and installation. Elevated structures, extra batteries and civil work are quoted separately. Shops, offices and other non-residential buildings pay the price before subsidy. 10 kW and larger systems are priced after a load study. Solar units assume about 1,440 units per kWp a year in Bengaluru; your roof and shading decide the real figure.

Backup calculator

How long will the battery run your home?

Enter what you want running during a power cut. The calculator assumes everything you select is on at the same time, which is the worst case.

Running load–
Backup time on battery–
Usable battery energy–
Inverter check–
Battery for a 4-hour cut–
Battery for an 8-hour night–

Usable energy assumes 90% depth of discharge and about 92% inverter efficiency. Solar extends backup during daytime cuts. Fridges, pumps and ACs cycle on and off, so real backup is usually longer than shown.

Honest advice

Is hybrid solar worth it for your home?

A battery adds cost. It earns its place only if power cuts actually hurt you.

Choose hybrid if

  • Cuts disrupt work or study: work from home, online classes, a home office or clinic
  • Someone at home depends on power: elderly parents, medical equipment, a newborn
  • Your area sees frequent or long cuts, or voltage drops during the monsoon
  • You already run, or plan to buy, an inverter UPS or generator. A hybrid replaces it with free solar charging

On-grid is enough if

  • Cuts are rare and short where you live
  • Your main goal is the lowest possible bill for the money spent
  • Your current UPS inverter is fine and you are happy to keep it
  • Budget is tight. You can choose a hybrid-ready inverter now and add a battery later

Compare on-grid prices on our rooftop solar cost guide.

What you get

What's inside an Eltron hybrid system

Every quote names the make and model of each part, so you can compare like for like.

  • Solar panels: TOPCon DCR modules, 550–625 Wp, from Waaree, Saatvik, Adani, Loom or Novasys
  • Hybrid inverter: Deye, Power One or Feston, single- or three-phase to match your connection
  • Battery: lithium iron phosphate (LFP) modules of 5.1 kWh each, stackable as your needs grow
  • Protection: DCDB and ACDB, lightning arrester and earthing pits
  • Cabling: Polycab or equivalent DC and AC cables with MC4 connectors
  • Backup wiring: your chosen circuits moved to the inverter's backup output
  • Monitoring: phone app showing solar, battery, home use and grid export live
  • Paperwork: PM Surya Ghar registration, BESCOM net-meter application and commissioning

Warranties and service

Panels: 15-year product and 30-year performance warranty.
Hybrid inverter: 5-year manufacturer warranty.
Lithium battery: 5-year manufacturer warranty.
Eltron: 5 years of free maintenance: health checks, online monitoring, and free replacement of faulty parts within warranty. Panel cleaning and civil work are not included.

Why lithium (LFP), not lead-acid

No water top-ups, no acid fumes, about 90% of the capacity is usable every night, and a 5.1 kWh module fits on a wall. Lead-acid tubular batteries cost less upfront but give less usable energy and wear out sooner with daily solar cycling.

Subsidy and BESCOM

Hybrid solar subsidy and net metering in Karnataka

Subsidy on the solar part

Homes get the PM Surya Ghar subsidy on panel capacity: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000. The battery and its share of the inverter are not subsidised.

Same net metering as on-grid

A hybrid system connects to BESCOM through a bi-directional net meter. Daytime surplus is exported and credited, so you are not forced to store everything in the battery.

Conditions to qualify

A residential electricity connection in your name, DCR panels, registration on the national portal before installation, and a registered vendor. Eltron handles the registration and the claim. Full subsidy guide

Process

How we install your hybrid system

List your must-run loads

On a call, we note what must stay on in a cut and for how long, along with a year of BESCOM bills.

Site survey and 3D design

We check the roof, shading, structure height, inverter and battery location, and design the layout in 3D.

Itemised quote

Panel, inverter and battery make and model, backup circuits, structure, exclusions and payment terms in writing.

Subsidy and BESCOM paperwork

We register you on the PM Surya Ghar portal and apply to BESCOM for net metering before installation.

Installation

Material arrives 20–25 working days after the advance. Installation usually takes 1–2 days, with backup circuits wired separately.

Net meter, handover and subsidy

BESCOM fits the net meter, we commission the system, set battery priorities in the app and file your subsidy claim.

Our work

Hybrid solar design and installation by Eltron

Every hybrid proposal starts with drawings like these, so you see exactly where panels, columns and the battery go before you pay anything.

3D design by Eltron Energy for an 8 kW hybrid solar system on a Bengaluru home: two elevated arrays of 550 Wp panels (7.7 kWp) built around the water tank and skylight
Engineering design8 kW hybrid system for a Bengaluru home Two elevated arrays (7.7 kWp) planned around the water tank and skylight.
Eltron Energy roof plan and section drawing for a hybrid rooftop solar system, showing array layout, skylight and plumbing shaft kept clear, 10 degree south tilt and 7 foot clear height
Engineering designRoof plan and structural section Columns, tilt angle and clear height are fixed on paper before any steel is cut.
Elevated on-grid rooftop solar array installed by Eltron Energy on a building terrace in Bengaluru, keeping the terrace usable underneath
Installed by EltronElevated structure on a Bengaluru terrace Panels raised on an elevated structure, keeping the terrace below free to use.
Rooftop solar panels on an aluminium tilt structure over a metal-sheet roof, installed by Eltron Energy near Bengaluru
Installed by EltronAluminium tilt structure on a sheet roof Modules tilted on an aluminium structure over a metal-sheet roof, near Bengaluru.

Drawings are from an Eltron hybrid proposal (October 2026), shown without the client's details. Photos are Eltron installations around Bengaluru (December 2025) and show our structure work; they are not necessarily hybrid systems.

Customer reviews

What Eltron customers say on Google

4.5★★★★★from 35 Google reviews · Read every review on Google

“We recently completed a 65 kW solar power installation for our apartment complex with Eltron Energies, and the experience was outstanding from start to finish… The project was completed on time, and the energy savings have already started kicking in.”

Raj Nandi · 65 kW, apartment complex Google review

“I am very much pleased and happy about the service and the quality of M/s Eltron Energy Private Limited who installed Solar Panel on my roof top. The quality of the panels, fabrications, Inverter etc are upto the mark. Even after sales service is also excellent.”

Jairaj D · Rooftop solar Google review

“The entire process was Good and hassle-free, with their team providing excellent guidance and support throughout. The system is performing efficiently, and the cost was very reasonable compared to other options in the market.”

Buranuddin Buran · Rooftop solar Google review

“We installed a 5 kW solar on-grid setup. Our electricity bill has become zero. Sometimes in winter, the electricity bill even goes negative, because BESCOM refunds us money.”

Chand Basha · 5 kW on-grid Google review

Quoted word for word from public Google reviews of Eltron Energy Private Limited (some trimmed, marked …). The 4.5 rating includes every review, good and bad.

FAQs

Hybrid solar FAQs

Does a hybrid solar system work during a power cut?

Yes. When BESCOM supply fails, the hybrid inverter disconnects from the grid for line safety and runs your backup circuits from the battery and from solar, if the sun is up. The switchover is automatic and usually takes a fraction of a second. A standard on-grid system shuts down completely during a cut.

What is the price of a 3 kW hybrid solar system in Bangalore?

An Eltron 3 kW hybrid system with 3.3 kWp of TOPCon DCR panels and a 5.1 kWh lithium battery costs about ₹3.64 lakh including GST and installation. For a home that qualifies for the PM Surya Ghar subsidy, the net cost is about ₹2.86 lakh.

What does a 5 kW hybrid solar system cost?

A 5 kW single-phase hybrid system with 5.2 kWp of panels and a 5.1 kWh lithium battery costs about ₹4.90 lakh including GST, or ₹4.12 lakh after the ₹78,000 subsidy. The three-phase version costs about ₹5.14 lakh, or ₹4.36 lakh after subsidy. Extra batteries are priced in your quote.

Is the PM Surya Ghar subsidy available for hybrid solar?

Yes, for homes. The subsidy is calculated on the solar panel capacity only, at ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000. The battery is not subsidised. You need a residential connection, DCR panels and registration on the national portal before installation.

How many hours of backup will I get?

It depends on what you run. A 5.1 kWh lithium battery gives roughly 8 hours for 500 W of essentials such as lights, fans, Wi-Fi, a TV and the fridge. Two batteries double that. Use the backup calculator on this page with your own appliances.

Can I add a battery to my existing on-grid solar system?

Often, yes. Some hybrid inverters can be added alongside an existing on-grid inverter, and in other cases we replace the on-grid inverter with a hybrid one and keep your panels. We check your current inverter and wiring at the survey before recommending either route.

Can a hybrid solar system run an air conditioner?

Yes, if the inverter and battery are sized for it. A 1.5-ton AC draws about 1.5 kW while the compressor runs, so a single 5.1 kWh battery would run it for roughly 2–3 hours on its own. Most homes back up essentials and use the AC only when solar or the grid is available.

Does net metering work with a hybrid system?

Yes. A hybrid system connects to BESCOM through a bi-directional net meter, exactly like an on-grid system. Surplus solar is exported and credited on your bill, and Eltron handles the net-meter application.

What warranty do I get on a hybrid system?

Panels carry a 15-year product and 30-year performance warranty. The hybrid inverter and the lithium battery each carry a 5-year manufacturer warranty. Eltron adds 5 years of free maintenance, which covers health checks, monitoring and replacement of faulty parts within warranty, but not panel cleaning or civil work.

How long does installation take?

Material is delivered 20–25 working days after the advance payment. Installation on your roof usually takes 1–2 days. The net meter is fitted by BESCOM after inspection, which adds a few weeks depending on your sub-division.

Tell us what must stay on. We size the rest.

Free site survey, 3D design and an itemised hybrid quote. No obligation.