Industrial solar · Bengaluru & Karnataka

Industrial Rooftop Solar for Factories in Bangalore. Engineered for production.

Turn idle factory and warehouse roofs into your lowest-cost source of power. Eltron designs, builds and maintains rooftop plants from 100 kW to 1 MW+ for metal-sheet sheds, multi-shift loads and HT connections, turnkey.

₹2–3lifetime cost per unit
3.5–4 yrstypical payback
1 MWnet metering limit (KERC 2026)
Free feasibility study

Size a plant for your factory

Share a few details. Our engineer reviews your bills and roof, then sends a sized proposal with payback and depreciation numbers.

A solar engineer calls you within 1 working day. No obligation. We never share your number.

Thank you! Your details have reached our industrial solar team, and an engineer will call you within 1 working day. Want a faster reply? Message us on WhatsApp.
2.5 MW+ commissioned
Tier-1 TOPCon & Mono PERC modules
BESCOM & GESCOM approvals handled
3D shadow & structural study
5 years free O&M
01 — The business case

Why manufacturers in Karnataka are moving to rooftop solar

Power is one of a factory's largest variable costs. A rooftop plant fixes a large share of it for 25 years, on a roof you already own.

₹11,600

saved per kW installed, every year, at ₹8 a unit

40%

accelerated depreciation on the plant in year one

25+ yrs

of generation from a single investment

~1,000 t

CO₂ avoided per MW per year for your Scope 2 reporting

What a unit of power costs your factory

Diesel generator ₹25+ / unit
Grid power (industrial tariff) ₹7.5–9+ / unit
Eltron rooftop solar ₹2–3 / unit

Indicative, Karnataka 2026. Grid cost excludes fixed and demand charges. Solar is the lifetime cost of a plant over 25 years.

02 — 1 MW plant cost

How much does a 1 MW solar plant cost in Karnataka?

A 1 MW grid-connected rooftop solar plant typically costs ₹3.7–4.4 crore including GST, installation, structure and DISCOM approvals. The final figure depends on module technology (TOPCon or Mono PERC), roof type, structure height and cable distances.

On a factory roof, that plant generates around 14.5 lakh units a year. At an industrial tariff of ₹8 a unit, it saves roughly ₹1.16 crore annually and pays back in about 3.5 years, before the depreciation benefit.

  • 70,000–90,000 sq ftshadow-free roof needed
  • 14.5 lakh unitsgeneration per year
  • ≈ ₹1.16 Crannual savings at ₹8/unit
  • ~3.5 yearssimple payback
Get a 1 MW proposal for your site

Where the money goes in a 1 MW rooftop plant

52%12%11%10%9%
  • Solar modules~52%
  • Mounting structure~12%
  • Cables, DCDB / ACDB, earthing~11%
  • Installation & commissioning~10%
  • Inverters & monitoring~9%
  • Design, approvals & net meter~6%

Typical split for a 1 MW rooftop plant. Ground-mounted plants need 4–5 acres of land and cost differently.

03 — Pricing by size

Industrial solar cost in Bangalore: 100 kW to 1 MW

Indicative prices for grid-connected plants on metal-sheet or RCC factory roofs, including GST, installation, structure and BESCOM liaison.

Plant sizeIndicative cost (incl. GST)Units / yearSavings / year at ₹8Simple paybackRoof area
100 kW₹42 – 50 lakh1,45,000₹11.6 lakh~4.0 years7,000 – 9,000 sq ft
250 kW₹1.0 – 1.2 crore3,62,500₹29 lakh~3.8 years18,000 – 22,000 sq ft
500 kW₹1.9 – 2.3 crore7,25,000₹58 lakh~3.6 years35,000 – 45,000 sq ft
1 MW₹3.7 – 4.4 crore14,50,000₹1.16 crore~3.5 years70,000 – 90,000 sq ft

Based on recent Eltron quotations, November 2026. Generation assumes 1,450 units per kW per year. Payback is before the 40% depreciation benefit. Your price is fixed after a site survey.

04 — ROI calculator

Calculate your factory's solar savings

Enter your monthly bill and shift pattern. We size the plant to your daytime consumption, capped at the 1 MW net-metering limit.

Get an engineered proposal
Recommended plant size–
Indicative investment (incl. GST)–
Generation per year–
Savings per year–
Simple payback–
Year-1 tax saved (40% depreciation)*–
Roof area needed–
25-year savings–

Estimates only: 1,450 units/kW/year and Eltron indicative pricing. *25.17% corporate tax rate, plant in use 180+ days in the financial year. Confirm tax treatment with your CA.

05 — Engineering

Engineered for industrial roofs and loads

A factory roof is not a house roof. Every Eltron industrial plant starts with a structural and electrical study, not a price list.

Structural assessment

Panels and mounting add roughly 12–15 kg/m². We check purlins, roof-sheet age and wind loads before design, and flag sheets that should be replaced before installation.

Right mounting for every roof

Mini-rail on trapezoidal sheets, non-penetrative clamps on standing-seam roofs, and hot-dip galvanised elevated structures on RCC, all sealed against leaks.

HT / LT electrical integration

Inverters, protection and metering are planned around your sanctioned load or contract demand, with DG synchronisation and zero-export control where your site needs them.

Safety built in

Walkways, lifeline points and clear fire-access paths are part of the layout, so your maintenance team and inspectors can move safely across the roof.

Our work

Industrial rooftop solar work by Eltron

Real installations on metal-sheet roofs, and the 3D plant layouts our engineers prepare before any steel or module is ordered. You see the exact panel count, setbacks and string layout for your roof in the proposal.

Industrial rooftop solar plant on a metal-sheet factory shed with safety walkway lines, installed by Eltron Energy in Karnataka
Installed by EltronRooftop solar on an industrial metal-sheet shed Modules laid in long rows along a factory roof in Karnataka.
3D rooftop solar plant layout by Eltron Energy: 94.05 kWp using 171 panels, arranged around roof obstructions with measured setbacks
Engineering design94 kWp plant layout, 171 modules Arrays placed around roof obstructions, with roof dimensions marked.
Rooftop solar panels on an aluminium tilt structure over a metal-sheet roof, installed by Eltron Energy near Bengaluru
Installed by EltronAluminium tilt structure on a metal-sheet roof Modules tilted on an aluminium structure over a sheet roof near Bengaluru (Dec 2025).
3D rooftop solar layout by Eltron Energy engineers: 150 kWp across two building blocks using 240 x 625 Wp panels, with roof dimensions marked
Engineering design150 kWp layout across two roof blocks 240 modules of 625 Wp, split into arrays that fit each roof section.

Photos are from Eltron installations in Karnataka. Design images are 3D layouts our engineers prepare for every proposal; a design is not a completed project.

06 — Monitoring & O&M

See every unit your roof produces

Each plant ships with remote monitoring, so your plant head and finance team can track generation, savings and faults from a phone, without a site visit.

  • Live generation and savings per inverter and string
  • Fault alerts so issues are fixed before output drops
  • 5 years of free O&M: check-ups, monitoring and warranty replacements
  • Cleaning and AMC plans available after year five
500 kW plant · TodayGenerating
Energy today2,410 kWh
Saved today₹19,280
CO₂ avoided1.7 t
6 am9 am12 pm3 pm6 pm
Illustrative view of a typical sunny day in Bengaluru.
07 — Industries we serve

Solar for every kind of factory

From Peenya and Bommasandra to Ballari's garment units and Kalaburagi's mills.

Engineering & auto parts

CNC, press and fabrication loads that peak in daytime shifts.

Textiles & garments

Large sheds, steady machine loads and strong export ESG demands.

Food processing & cold chain

Refrigeration loads run all day; solar cuts the costliest hours.

Pharma & chemicals

Clean-room HVAC and process loads with high power quality needs.

Plastics & packaging

Moulding and extrusion lines with heavy, predictable consumption.

Warehouses & logistics

Vast roofs, modest loads: ideal for net metering and future EV charging.

Rice & flour mills

Daytime milling loads matched closely by solar output.

Electronics & assembly

Sensitive equipment, clean power and green-supply-chain targets.

08 — Delivery

From feasibility to commissioning in 8–12 weeks

One accountable team, a fixed scope and a written schedule planned around your production.

1Week 1

Feasibility study

12 months of bills, load profile, roof survey and 3D shadow study.

2Week 2

Engineered proposal

Size, yield, payback, depreciation and an itemised bill of materials.

3Weeks 3–6

Approvals & procurement

BESCOM / GESCOM application, feasibility and equipment ordering.

4Weeks 5–10

Installation

Structure, modules, inverters and protection, typically 3–6 weeks on site.

5Weeks 8–12

Commissioning

Inspection, net meter, synchronisation, monitoring handover.

09 — Tax & finance

No subsidy for industry. Better: 40% depreciation.

Central rooftop subsidies cover homes and housing societies only. Industrial buyers instead claim 40% accelerated depreciation on the plant, pay an effective GST of about 8.9% under the 70:30 rule, and own an asset that keeps paying for 25 years.

If the plant is in use for less than 180 days in its first financial year, half the rate (20%) applies that year and the balance carries forward.

Related: GST on solar panels in Karnataka

Example: 500 kW plant
Investment (incl. GST)₹2.1 crore
Year-1 depreciation (40%)₹84 lakh
Tax saved at 25.17%≈ ₹21 lakh
Year-1 bill savings at ₹8/unit≈ ₹58 lakh
Effective GST on the plant≈ 8.9%

Illustrative. Confirm tax treatment for your entity with your chartered accountant.

10 — Karnataka regulations

What KERC's 2026 rules mean for your factory

KERC's Grid Interactive Distributed Solar PV Plants Regulations, 2026 replaced the 2016 rooftop rules and widened the options for industrial consumers.

  • Net metering for all consumer categories, including industrial
  • Up to 1,000 kW per installation, subject to sanctioned load or contract demand
  • Virtual and group net metering for companies with several plants or premises
  • Net billing and gross metering options; we model which works best for your tariff

We confirm the current BESCOM or GESCOM procedure for your connection before quoting. See also DCR vs non-DCR panels and rooftop solar requirements in Karnataka.

11 — Equipment & warranties

Built to generate for 25 years and more

30 yrs

Module performance

TOPCon or Mono PERC modules with a 30-year performance warranty.

15 yrs

Module product

Manufacturer warranty against defects on every panel.

10 yrs

Inverter

Three-phase string inverters with remote monitoring.

5 yrs

Free O&M

Check-ups, monitoring and warranty replacements by Eltron. Cleaning and civil work excluded.

WaareeAdani SolarDeye InvertersHot-dip GI structuresIEC-certified modules
Customer reviews

What Eltron customers say on Google

4.5★★★★★from 35 Google reviews · Read every review on Google

“We recently completed a 65 kW solar power installation for our apartment complex with Eltron Energies, and the experience was outstanding from start to finish… The project was completed on time, and the energy savings have already started kicking in.”

Raj Nandi · 65 kW, apartment complex Google review

“I am very much pleased and happy about the service and the quality of M/s Eltron Energy Private Limited who installed Solar Panel on my roof top. The quality of the panels, fabrications, Inverter etc are upto the mark. Even after sales service is also excellent.”

Jairaj D · Rooftop solar Google review

“The entire process was Good and hassle-free, with their team providing excellent guidance and support throughout. The system is performing efficiently, and the cost was very reasonable compared to other options in the market.”

Buranuddin Buran · Rooftop solar Google review

“We installed a 5 kW solar on-grid setup. Our electricity bill has become zero. Sometimes in winter, the electricity bill even goes negative, because BESCOM refunds us money.”

Chand Basha · 5 kW on-grid Google review

Quoted word for word from public Google reviews of Eltron Energy Private Limited (some trimmed, marked …). The 4.5 rating includes every review, good and bad.

Organisations that have worked with Eltron

JSW logoL&T logoIndianOil logoBharat Petroleum logoHindustan Petroleum logoBioGreen logoGovernment of Karnataka logo
12 — FAQ

Industrial rooftop solar FAQs

How much does a 1 MW rooftop solar plant cost in Karnataka?

A 1 MW grid-connected rooftop solar plant typically costs ₹3.7–4.4 crore including GST, installation, structure and approvals. It generates about 14.5 lakh units a year and needs 70,000–90,000 sq ft of shadow-free roof.

What is the payback period for industrial rooftop solar?

At an industrial tariff of ₹8 a unit, most plants from 100 kW to 1 MW pay back in about 3.5–4 years from bill savings alone. The 40% depreciation benefit shortens this further.

Can my factory's metal-sheet roof carry solar panels?

Usually, yes. Panels and mounting add roughly 12–15 kg/m². We check the purlins, roof-sheet condition and wind loads, use mini-rail or non-penetrative clamps, and advise replacing sheets that are near the end of their life before installation.

Is there a subsidy for industrial rooftop solar?

No. Central rooftop subsidies apply to homes and housing societies only. Industries benefit from 40% accelerated depreciation, an effective GST of about 8.9% on the plant, and net metering up to 1 MW.

What if my factory needs more than 1 MW?

Net metering is capped at 1,000 kW per installation under KERC's 2026 regulations. Beyond that we model net billing, gross metering, separate connections, or group and virtual net metering across your premises.

We run three shifts. Is solar still worth it?

Yes. A 24×7 plant uses every solar unit on site, so each one replaces a full-price grid unit. Solar covers your daytime share, and the payback stays attractive.

Will solar work alongside our diesel generators?

Yes. A DG synchronisation controller lets solar run with your generators during outages, cutting diesel consumption without reverse-feeding the DG.

How long does an industrial solar project take?

Typically 8–12 weeks from order to commissioning for 100 kW to 1 MW. On-site installation takes 3–6 weeks and is planned around your production schedule.

Which industrial areas do you cover?

All of Karnataka, including Peenya, Bommasandra, Jigani, Doddaballapur, Hoskote and Nelamangala around Bengaluru, plus Ballari and Kalaburagi through our branches in GESCOM areas.

Next step

Send 12 months of bills. Get an engineered proposal.

Free feasibility study, structural check and 3D shadow analysis for your factory. No obligation.